SRS Repair of Low Slope Roofing Systems

Industrial Flat roof repaired, clerestory walls rebuilt

Industrial Flat roof repaired, clerestory walls rebuilt

 


Ponding water problem

Ponding water problem

 

After cleaning and preparation

After cleaning and preparation

 

Proper fill as remedy (finish pending)

Proper fill as remedy (finish pending)

 

Outlet enlarged

Outlet enlarged

 

Base layer integrated

Base layer integrated

 

w/Finish cap sheet

w/Finish cap sheet

 


P1040190

P1040223

P1040238

P1040252